Shop finishing

This photoset has 3 pictures

Shop Door

This photoset has 11 pictures

Shop Electrical

This photoset has 2 pictures

Shop Siding, Stucco

This photoset has 8 pictures

Shop roofing

This photoset has 4 pictures

Shop Framing

This photoset has 27 pictures

Shop Floor (Radiant Heat)

This photoset has 41 pictures

Shop Foundation

This photoset has 40 pictures

Shop Excavation

This photoset has 18 pictures

Terri's 2008 Gardening

This photoset has 9 pictures

eBay

This photoset has 2 pictures

Duane's Woodshop

This photoset has 5 pictures

Historical Technology

This photoset has 1 pictures

White Barn Home For Sale

This photoset has 16 pictures

Stieff Soundboard repair

This photoset has 10 pictures

Stieff bridge repair

This photoset has 38 pictures

Stieff Veneer Repair

This photoset has 10 pictures
The inside veneer was separated at the top. After inserting Titebond glue with the aid of a veterinary syringe, the veneer was "adequately" clamped.

Stieff plate removal

This photoset has 21 pictures

Stieff disassembly

This photoset has 52 pictures

Stieff Piano Shop Legs

This photoset has 14 pictures
Building shop legs for the Stieff. Used the leg locking mechanism from the regular legs, and 8 inch casters from Harbor Frieght Tools.

Moving Stieff Grand Piano

This photoset has 47 pictures

Bicycling

This photoset has 6 pictures

Pianos

This photoset has 2 pictures